Close Menu
    Tags
    ai apple BJP cg news Champions Trophy 2025 Chhattisgarh Chhattisgarh News china Congress cricket donald trump elon musk featured google Hindi News Hindustan India ind vs eng IPL IPL 2024 IPL 2025 Israel Israel Hamas War Jammu and Kashmir latest news Lok Sabha elections 2024 Madhya Pradesh Madhya Pradesh news market Narendra Modi News in Hindi Pahalgam Terror Attack Pakistan pm modi Rahul Gandhi Raipur Rohit Sharma samsung T20 World Cup 2024 Team India the chhattisgarh United States Virat Kohli whatsapp World Cup 2023
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram YouTube
    The Chhattisgarh
    Member Login
    • World
    • India
    • Chhattisgarh
    • Madhya Pradesh
    • Sports
    • Technology
    The Chhattisgarh
    Home»India»Successful testing of the first phase of Gaganyaan mission, ISRO Chief told why the launch was delayed
    India

    Successful testing of the first phase of Gaganyaan mission, ISRO Chief told why the launch was delayed

    The ChhattisgarhBy The ChhattisgarhOctober 21, 20233 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    ISRO has successfully conducted the flight test of the first phase of its ambitious mission Gaganyaan (Mission Gaganyan First Trial Successful). The crew module of Gaganyaan was launched from Sriharikota in Andhra Pradesh. The trial was initially scheduled to take place at 8.45 am but due to a computer glitch, it was stopped shortly before the launch. ISRO has created history by resolving the technical glitch in just half an hour. ISRO Chief expressed happiness after the successful launch of Gaganyaan Mission. Earlier the flight was stopped due to technical glitch. However, the problem was rectified in just half an hour.

    This is how Gaganyaan mission landed in the Bay of Bengal

    After taking off from Sriharikota, Gaganyaan landed in the Bay of Bengal. After take off, first the test vehicle took the crew module and crew escape system into the sky and then took the crew module and crew escape system 17 km with a speed of 594 km. Separated at a height of. After this, two and a half km from water. Its landing took place in the Bay of Bengal with the opening of the module’s main parachute at an altitude of Now the recovery of the crew module and escape system will take place from here. The purpose of this ISRO test is to prepare the Gaganyaan mission for 2025, so that it can be found out how the astronauts will be evacuated safely if any disturbance occurs during the Gaganyaan mission.

    First test flight of Gaganyaan mission successful, ISRO created history by fixing technical glitch in just half an hour pic.twitter.com/Ii6pShwXdu

    — NDTV India (@ndtvindia) October 21, 2023

    Also read- Gaganyaan Mission Test Flight LIVE Updates: The first flight of Gaganyaan Mission was stopped 5 seconds ago, now it will not be launched today.

    ISRO Chief expressed happiness and congratulated the scientists

    ISRO Chief S Somnath said, “I am very happy to announce the success of Gaganyaan TV-D1 mission.” He said that we have created history again. He congratulated all the scientists for the success of the first phase of this mission.

    #WATCH , ISRO chief S Somanath says, “I am very happy to announce the successful accomplishment of Gaganyaan TV-D1 mission” pic.twitter.com/MyeeMmUSlY

    — ANI (@ANI) October 21, 2023

    Fixed mission glitch in just half an hour

    After the computer glitch was rectified, ISRO had tweeted saying that the reason for stopping the TV-D1 launch of Gaganyaan has been identified and rectified. Now the launch will take place at 10 am. Earlier, as soon as the launch was put on hold, ISRO Chief S Somnath had said, ‘The lift-off attempt could not be made today. The first testing of the mission was to take place at 8 am today but due to bad weather, its time was changed to 8:45. Was. The engine could not ignite properly. Now it is being ascertained what went wrong. He said that the vehicle fitted with the rocket is safe. Now it needs to be seen what happened. He said that we will come back soon. Launch from the computer has been stopped. We will fix whatever is wrong and schedule the launch soon. After which the problem was rectified within half an hour and the first phase of the mission was launched.

    Also read-What is Mission Gaganyaan? Why is it so special for India?

    Gaganyaan Mission Gaganyaan mission launching Gaganyaan mission test flight gaganyan mission ISRO ISRO chief isro chief somanath
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link

    Related Posts

    Baisaran Bloodbath To Operation Sindoor: Is South Asia Sleepwalking Into Its Next War? |

    May 17, 2025

    “Nothing In Pakistan Is Beyond The Reach Of Indian Army”: J-K LG Manoj Sinha |

    May 17, 2025

    Irked Congress Excludes Shashi Tharoor From List Of MPs To Be Part Of ‘Expose Pakistan’ Delegation |

    May 17, 2025

    Shashi Tharoor To Lead India’s Delegation To Expose Pakistan’s Terrorism At Global Stage, Congress Reacts |

    May 17, 2025

    India To Launch Global Campaign To Expose Pakistan’s Support For Terrorism |

    May 16, 2025

    Amit Shah To Lay Foundation Stone Of Flyovers Worth Rs 379 Crore In Ahmedabad |

    May 16, 2025
    -Advertisement-
    Advertisement
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    © 2025 The Chhattisgarh. All Rights Reserved.
    • Contact Us
    • About Us
    • Terms & Conditions
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.