Commuter woes between Noida and Greater Noida could soon be history, thanks to a swiftly advancing bridge over the Hindon River. Linking Knowledge Park III directly to Sectors 146-147, this new pathway includes approach roads designed to divert traffic from overcrowded Pari Chowk.
Greater Noida Authority GM AK Singh’s Tuesday inspection highlighted impressive strides. The 1-km Greater Noida approach road, with a 25-crore price tag, stands at 50% completion, slated for finalization in six months. Bridge Corporation’s bridge construction matches this pace.
The authority’s strategy focuses on concurrent completion, allowing seamless vehicular access upon readiness. CEO NG Ravi Kumar champions the effort, noting benefits like trimmed travel times, distance savings, and relief at critical junctions such as Pari Chowk.
Tailored for local populace in targeted sectors, the route enhances daily life and regional mobility. With rigorous oversight, the project embodies commitment to modern infrastructure needs.
Optimism prevails among stakeholders, who foresee this development as a game-changer for traffic flow and urban living in the Noida-Greater Noida belt.